Landscape Architecture Billable vs Non-Billable Hours
Understand how landscape architecture firms track billable vs non-billable hours, set realistic utilization targets, and protect project margins.
Most landscape architecture firms lose money not because they underprice projects, but because they misclassify time — or never classify it at all. Getting billable vs non-billable hours right is the foundation of every profitability metric that matters: utilization rate, overhead multiplier, and whether a fixed-fee project actually made money.
What Counts as Billable Time
Billable time is any hour that can be charged directly to a client project, whether invoiced at cost or included in a fixed fee. The key word is directly. Hours spent on schematic design for a park renovation are billable. Hours spent writing the proposal to win that park renovation are not.
In a landscape architecture context, billable work typically spans all seven standard project phases: pre-design and programming, schematic design, design development, construction documents, bidding and procurement, construction administration, and post-construction services. Time spent on site observation, RFI responses, submittal reviews, and client meetings tied to an active project all count. So does coordination with civil, structural, or MEP consultants when that coordination is scoped into the contract.
The practical test: if the time could appear on a line item in your scope of services, it's billable. If it couldn't, it isn't.
What Counts as Non-Billable Time
Non-billable time falls into two broad buckets: overhead and investment.
Overhead is the cost of keeping the firm running. This includes internal meetings not tied to a specific project, bookkeeping, HR tasks, IT troubleshooting, and general office administration. It also includes business development — calls, proposals, RFQ responses, and networking. For most firms, business development alone accounts for 8–15% of total staff hours annually.
Investment is time that builds future capacity: staff training, software learning, internal design standards development, portfolio work, and research. These hours have real value but don't belong on a client invoice.
The line gets blurry in a few places. Quality control reviews on a project are billable if they're scoped; if a principal reviews every CD set as a firm standard regardless of scope, that time often bleeds into overhead. Marking the distinction clearly in your time-tracking categories prevents end-of-year surprises.
Utilization Rate: The Number That Ties It Together
Utilization rate is the percentage of total available hours that are billable. It's the single most useful metric for understanding whether your team is sized correctly for your workload.
Formula:
Utilization Rate = (Billable Hours ÷ Total Available Hours) × 100
A 40-hour week, 52 weeks, minus two weeks PTO and standard holidays gives roughly 1,880–1,920 available hours per year per full-time employee. A typical target range for a landscape architecture firm:
| Role | Target Utilization |
|---|---|
| Senior designer / PM | 65–75% |
| Mid-level designer | 75–85% |
| Junior designer / intern | 80–90% |
| Principal | 40–60% |
| Firm administrator | 0–10% |
Principals run lower because business development, client relationships, and firm management are inherently non-billable. Pushing a principal above 65% usually means either the firm is understaffed or the principal is underinvesting in growth.
For illustration: a five-person firm with an average utilization of 68% and a blended billing rate of $130/hour generates roughly $830,000 in billable revenue annually. Drop that utilization to 58% and revenue falls to about $710,000 — a $120,000 gap that doesn't show up on any single invoice but accumulates quietly across the year.
How Fixed-Fee Projects Expose the Problem
Time-and-materials contracts surface billing misclassification quickly — if an hour isn't coded to a project, it doesn't get invoiced. Fixed-fee contracts hide the problem until the project closes.
On a fixed-fee project, every non-billable hour a designer spends on that project is a direct hit to margin. If a $45,000 CD package was scoped at 180 hours and the team actually logs 240 hours — including 30 hours of internal coordination that nobody tracked separately — the effective billing rate drops from $250/hour to $187/hour. That's not a pricing problem. It's a time classification and scope management problem.
Firms that handle this well set a budget by phase at the start of every project, track hours against that budget weekly, and flag overruns before they compound. The phase breakdown matters because CA almost always runs over on projects with active contractors, and knowing that SD came in under gives the PM room to negotiate or absorb it.
Setting Up Your Time Codes
A workable time code structure for a landscape architecture firm doesn't need to be complex. The goal is enough granularity to catch problems, not so much that staff spend ten minutes deciding how to log a 30-minute task.
A practical structure:
- Project codes — one per active project, subdivided by phase (SD, DD, CD, CA, etc.)
- Business development — proposals, RFQs, interviews, networking
- Marketing — portfolio, website, photography, award submissions
- Training and professional development — continuing education, software training, ASLA events
- Administration — internal meetings, bookkeeping, HR, IT
- PTO and leave — vacation, sick, holidays
Keep phase codes consistent across projects so you can compare actual hours by phase across your portfolio. If your firm consistently overruns CA by 40%, that's a scoping problem you can fix. If you can't see it in aggregate, you can't fix it.
Common Mistakes Firms Make
1. Letting principals log time to "admin" by default. Principal time on business development, client relationship management, and proposal writing is non-billable, but it's not the same as administrative overhead. Mixing them makes it impossible to calculate the true cost of winning work.
2. Coding internal QC reviews to the project without checking the scope. If your contract doesn't include a principal review milestone, that time is overhead — and logging it as billable inflates your apparent utilization without producing revenue.
3. Not tracking non-billable time at all. Some firms only require staff to log billable hours. This makes utilization look artificially high and hides how much time is actually going to overhead. You can't manage what you don't measure.
4. Using a single "non-billable" bucket. Lumping business development, training, and administration together makes it impossible to know whether your BD spend is proportionate to revenue or whether training investment is actually happening.
5. Forgetting reimbursable expenses in the billable/non-billable framework. Reimbursable costs — printing, travel, permit fees, consultant invoices — aren't hours, but they affect project profitability the same way unbilled time does. Firms that track hours carefully but ignore reimbursable pass-throughs still leave money on the table.
6. Waiting until invoice time to reconcile phase budgets. By the time you're generating an invoice, it's too late to course-correct on hours. Reviewing phase budget vs. actuals weekly — not monthly — is what prevents fixed-fee projects from quietly hemorrhaging margin.
What Good Looks Like at the Firm Level
A firm with healthy time tracking discipline can answer these questions at any point in a project:
- What percentage of this project's total budget has been consumed by phase?
- Is the current burn rate consistent with the remaining scope?
- Which staff members are running above or below utilization targets this month?
- What's the ratio of BD hours to total non-billable hours firm-wide?
Firms that can answer those questions in under five minutes are managing time well. Firms that have to pull spreadsheets, cross-reference Harvest exports, and ask PMs to reconstruct their week are not — regardless of how sophisticated their invoicing looks to clients.
The practical benchmark: non-billable time should represent 25–40% of total firm hours. Below 25%, the firm is probably underinvesting in business development and training. Above 40%, overhead is eating the margin that billable work is supposed to generate.
How Phasewise Handles This
Phasewise is built around the seven standard landscape architecture project phases, which means time entries are always coded to a phase — not just a project. The weekly timesheet grid makes it straightforward for staff to log both billable and non-billable time in the same place, including leave and overhead categories. The profitability reports show actual hours by project and by person against budget, so PMs can see phase-level overruns before they reach invoice time rather than after.
Related Reading
- Landscape Architect Utilization Rate
- How To Calculate Landscape Architect Profit Margin
- Landscape Design Firm Time Tracking Software
Tracking billable vs non-billable hours by phase is the difference between knowing your margin and guessing at it. Phasewise ties phase-level time budgets to profitability reports so you can see exactly where projects stand. Try it free for 14 days.